photo_20141010_173710

Test site with 9 CPVRS systems running

Our test site is operating since September 2014 with 9 CPVRS 072 systems connected to ABB Power-One inverters. One system is connected to a PVI 3.0 while the remaining 8 are connected to a new PRO-33 under beta test.

We are very happy with how the CPVRS systems and the inverters are working up together. System efficiencies as high as 32% on the DC side have been recorded so long.

The objective of this test field is to gather experience with our new CPVRS product, so that future installations abroad can run smoothly. We are now looking to set up new pilot installations abroad together with partners interested in assembling and distributing our product in their region.